DPW Project List – September 16 – September 20, 2019

Town of Bennington Project List
Week of September 16, 2019 – September 20, 2019

 Please be Advised: The Next Phase of PFOA Water Line extensions has begun.

 Airport Rd North will be reduced to One-Lane Traffic Men and equipment will be in the roadway paving. Please use Caution and Expect Delays.

 Airport Rd South will be reduced to One-Lane Traffic Men and equipment will be in the roadway paving. Please use Caution and Expect Delays.

Autumn Acres will be CLOSED for the next several weeks to through traffic for PFOA Water Line Extension Work.  Local traffic ONLY will be allowed.  Men and equipment will be in the roadway. Please find alternate route.

Fox Hill will be reduced to One-Lane Traffic Men and equipment will be in the roadway rebuilding manholes and paving. Please use Caution and Expect Delays.

Harwood Hill Road -between Orchard Rd and Rte 7 Connector will be reduced to One-Lane Traffic for the next several weeks for PFOA Water Line Extension Work.  Men and equipment will be on edges of the roadway. Please use Caution and Expect Delays.

Kocher Drive Will be reduced to One-Lane Traffic Men and equipment will be on edges of the roadway paving.  Please use Caution and Expect Delays.

River Street continues to be CLOSED to through traffic from 7:00a.m – 3:30p.m while several crews work on its rehabilitation. Local traffic ONLY will be allowed.  Men and equipment will be in the roadway. Please find alternate route.

Shields Drive will be reduced to One-Lane Traffic Men and equipment will be in the roadway paving. Please use Caution and Expect Delays.

Whipstock Rd will be reduced to One-Lane Traffic Men and equipment will be in the roadway paving. Please use Caution and Expect Delays.

Willow Roadwill be CLOSED for the next several weeks to through traffic for PFOA Water Line Extension Work.  Local traffic ONLY will be allowed.  Men and equipment will be in the roadway. Please find alternate route.

TOWNWIDE:

Water Department will be repairing curb stops and installing flushing hydrants in various areas. PLEASE USE CAUTION when approaching these areas.

Weed eating and mowing continues across town at various locations. PLEASE USE CAUTION when approaching these areas and expect delays.

Manhole sealing and Road Patching across town resumes. PLEASE USE CAUTION when approaching these areas and expect delays.

All Work will be dependent on weather conditions. Please use caution when entering a construction zone, men and equipment will be in the traveled portion of the road.

REMINDER:

Residents and Contractors – Please make sure ALL LOADS ARE COVERED when taking leaves and or brush to the Transfer Station.