DPW Road Work – August 26, 2019 – August 30, 2019

Town of Bennington Project List – Revised

Week of August 26, 2019 – August 30, 2019

Please be Advised: The Next Phase of PFOA Water Line extensions has begun.

Brooklyn Bridge – County St to Chapel Rd will be CLOSED to ALL traffic during the hours of 7:00am and 3:30pm while a contractor repairs and repaves the decking.   PLEASE FIND ALTERNATE ROUTE such as Park Street bridge to access &/or exit North Branch Street locations.

Dewey Street – Elm St. to Weeks St. will be reduced to One-Lane Traffic only on Tuesday. Men and equipment will be in the roadway.  Please use Caution and Expect Delays.

Harwood Hill Road -between Orchard Rd and Rte 7 Connector will be reduced to One-Lane Traffic for the next several weeks for PFOA Water Line Extension Work.  Men and equipment will be on edges of the roadway.  Please use Caution and Expect Delays.

 River Street – Benmont Ave to Lincoln St continues to be CLOSED to through traffic while several crews work on its rehabilitation. Local traffic ONLY will be allowed.  Men and equipment will be in the roadway. Please find alternate route.

 Willow Roadwill be CLOSED from Duffy Dr to East Rd for the next several weeks to through traffic for PFOA Water Line Extension Work.  Local traffic ONLY will be allowed.  Men and equipment will be in the roadway. Please find alternate route.

 TOWNWIDE:

Water Department will be repairing curb stops and installing flushing hydrants in various areas. PLEASE USE CAUTION when approaching these areas.

Manhole sealing and Road Patching across town resumes. PLEASE USE CAUTION when approaching these areas and expect delays.

All Work will be dependent on weather conditions. Please use caution when entering a construction zone, men and equipment will be in the traveled portion of the road.

REMINDER:

Residents and Contractors – Please make sure ALL LOADS ARE COVERED when taking leaves and or brush to the Transfer Station.