DPW Roadwork July 15-19, 2019

Town of Bennington Project List

Week of July 15 – 19, 2019

 

Lincoln Street Sidewalk continues to be Closed from River St to County St.  Highway crews continue sidewalks and curbing work.   Men and equipment will be in and on the edge of the roadway.  Please Use Caution when approaching this area and expect delays.

North Branch St at the entrance to Catamount MHP will be reduced to One-Lane Traffic as a Water Crew repairs a water valve.  Men and equipment will be in and on the edge of the roadway.  Please Use Caution when approaching this area and expect delays.

River Street – Benmont Ave to Lincoln St continues to be CLOSED to through traffic while several crews work on its rehabilitation.  Local traffic ONLY will be allowed.  Men and equipment will be in the roadway.  Please find alternate route.

  

TOWNWIDE:

Safety lines will be re-painted in various locations across town. PLEASE USE CAUTION when approaching these areas and expect delays

Weed eating continues across town at various locations.  PLEASE USE CAUTION when approaching these areas and expect delays

Roadside Mowing across town is expected to resume. PLEASE USE CAUTION when approaching these areas and expect delays

Sewer crews will be rebuilding manholes across town (weather permitting).  Men and Equipment will be in and on the edge of the roadways.  PLEASE USE CAUTION and expect delays when approaching these areas.

All Work will be dependent on weather conditions.  Please use caution when entering a construction zone, men and equipment will be in the traveled portion of the road.

 

REMINDER:

Please DO NOT rake or blow leaves into Town streets or Highways as this clogs storm drains and creates flooding and driving hazards for the entire community.

 

Residents and Contractors – Please make sure ALL LOADS ARE COVERED when taking leaves and or brush to the Transfer Station.