REMINDER: Town Office will be CLOSED Monday May 27, 2019 in observance of the Memorial Day Holiday.  Additionally, there will be NO Roadwork on Monday May 27th, 2019.

 

Blackberry Lane  will be reduced to One-Lane traffic for ditch work. Men and equipment will be in the roadway.  Please expect delays.

Harrington Road will be reduced to One-Lane traffic while Highway Crews continue ditch work.  Local traffic (including buses) WILL be accommodated.  Men and equipment will be in the roadway.  Please expect delays.

Middle Pownal Road (North of Finley Drive to top of hill) will be reduced to One-Lane traffic for ditch work. Men and equipment will be in the roadway.  Please expect delays.

School Street / Pleasant St area will be reduced to One-Lane traffic over the next several weeks as a Private Contractor begins rehabilitation work. Men and equipment will be in the roadway.  Please expect delays.

 

TOWNWIDE:

Highway crews will be grading dirt and gravel roads across town all week (weather permitting).  Men and Equipment will be in and on the edge of the roadways.  PLEASE USE CAUTION and expect delays.

Highway crews will also continue Downtown tree mulching on Main Street, North Street and South Street as well as setting the seasonal flower pots across town.  This requires men and equipment to be on the edge of the roadway.  PLEASE USE CAUTION

All Work will be dependent on weather conditions.  Please use caution when entering a construction zone, men and equipment will be in the traveled portion of the road.

  

REMINDER:

Please DO NOT rake or blow leaves into Town streets or Highways as this clogs storm drains and creates flooding and driving hazards for the entire community.

Residents and Contractors – Please make sure ALL LOADS ARE COVERED when taking leaves and or brush to the Transfer Station.