Construction Notice: DEWEY STREET PARTIAL CLOSURE

Please be advised Dewey Street will be closed to through traffic between Monument Avenue and Hospital Drive (only).  This construction project is expected to run 6-7 Weeks beginning Monday October 2 through November 24th. Local traffic only will be accommodated Monday through Friday from 7:00am to 5:00pm

 

Construction Notice: PFOA Water Line Extensions begin Monday.  This will require road closures.  Please see below.

 

Division Street remains Closed to through traffic all week.  Local traffic WILL be accommodated.  Highway crews will be removing old blacktop in preparation for paving.  Men and equipment will be in the roadway.  Please find alternate route.

Fairview Street will be Closed to through traffic all week for PFOA Water Line Extension Work.  Local traffic WILL be accommodated.  Men and equipment will be in the roadway.  Please find alternate route.

Grove Street – will be Closed to through traffic all week.  Local traffic WILL be accommodated.  Highway crews will be removing old blacktop in preparation for paving.  Men and equipment will be in the roadway.  Please find alternate route.

Murphy Road will be Closed to through traffic for two a week period for PFOA Water Line Extension Work.  Local traffic WILL be accommodated.  Men and equipment will be in the roadway.  Please find alternate route.

Orebed Road will be Closed to through traffic for a two-week period for PFOA Water Line Extension Work.  Local traffic WILL be accommodated.  Men and equipment will be in the roadway.  Please find alternate route.

Park Street between Gage St and Park St will be Closed MONDAY to through traffic between 8:30am-2:00pm.  Crews will be removing old blacktop in preparation for paving.  Local traffic and Busses WILL be accommodated.  Men and equipment will be in the roadway.  Please find alternate route.

South StreetTUESDAY Northbound Lane (only) will be CLOSED from Union Street to Main Street.  All Northbound Traffic will be re-routed via Elm Street between 7:00am and 6:00pm.  A private contractor will be repairing a sewer service line on South Street.  Please find alternate route and expect delays.

Townwide Work: A Sewer Crew will be working various areas sealing newly rebuilt manholes.  This will require men and equipment in the roadway.  Please use caution when approaching.  Expect minor delays.

 

Reminder – Leaf Season:

Please DO NOT rake or blow grass and/or leaves into Town streets or Highways as these clogs storm drains and creates flooding and driving hazards for the entire community.

 

Residents and Contractors – Please make sure all loads are covered when taking leaves and or brush to the transfer station.