  • Townwide Hydrant Flushing begins Monday October 17th and runs through Friday October 28th.   This program generally begins on the East side of Town and works it’s way West during the two-week period. Some may loose pressure or experience discolored water. These are normal side effects. Please run the Cold Water ONLY to restore water.
  • A Private Contractor will be painting road lines throughout Town all week during the nighttime hours. Please use caution when in that area.
  • South Branch Street will remain closed all week, as Highway crews will continue rehabilitation work. Local Traffic will continue to be accommodated.
  • – Roadside mowing continues West Side of Town. Please use caution when approaching this end of Town.
  • Grading of Dirt Roads in numerous locations throughout town will continue. Please use caution when traveling.
  • – Crews will also be building shoulders along all newly paved roads throughout Town. Please use caution when approaching.

 

All Work will be dependent on weather conditions. Please use caution when entering a construction zone; men and equipment will be in the traveled portion of the road.


Please Be Advised:

To BOTH Residents and Contractors – Please make sure all loads are covered when taking leaves and or brush to the transfer station.

Remember: Parking Ban begins November 15th