DPW Roadwork Oct 21-25, 2019

Town of Bennington Project List

Week of October 21 – 25, 2019

 

 **Townwide Hydrant Flushing continues Monday October 21th through Friday October 25th.  This program generally begins on the East side of Town and works its way West during the two-week period.  Some may lose pressure or experience discolored water.  These are normal side effects.  Please run the Cold Water ONLY to restore water.

 

PFOA Water Line Extensions work continues as well as Town DPW Projects.  These may require road closures or lane reductions.  Please find below the anticipated road closures and lane restrictions.

Autumn Acres will be reduced to One-Lane this week for PFOA Water Line Extension Work.    Men and equipment will be on the edge of the roadway.  Please use caution and expect delays.

Harwood Hill Road -between Orchard Rd and Rte 7 Connector will be reduced to One-Lane Traffic for the next several weeks for PFOA Water Line Extension Work.  Men and equipment will be on edges of the roadway.  Please use Caution and Expect Delays.

Houghton Lane will be reduced to One-Lane Traffic for the next several weeks for PFOA Water Line Extension Work.  Men and equipment will be on edges of the roadway.  Please use Caution and Expect Delays.

 

River Street is expected to be OPENED to through traffic.

 

Willow Roadwill be CLOSED for the next several weeks to through traffic for PFOA Water Line Extension Work.  Local traffic ONLY will be allowed.  Men and equipment will be in the roadway.  Please find alternate route.

 

TOWNWIDE:

Highway Crews will be in various locations across town conducting and completing smaller tasks from the construction season.  PLEASE USE CAUTION when approaching these areas men & equipment may be on the edge or in the roadway.  Delays may be possible.

Water Department begins Hydrant Flushing townwide.   Many roads may be temporarily reduced to One-lane.  Men and equipment will be in, or on the edge of the roadway.  Please use Caution and Expect Delays.

Sewer Department will be jetting various sewer mains across town. Many roads may be temporarily reduced to One-lane.  Men and equipment will be in, or on the edge of the roadway.  Please use Caution and Expect Delays.

 

All Work will be dependent on weather conditions.  Please use caution when entering a construction zone, men and equipment will be in the traveled portion of the road.

 

REMINDER – LEAF SEASON :

Please DO NOT rake or blow leaves into Town streets or Highways as this clogs storm drains and creates flooding and driving hazards for the entire community.