PFOA Water Line Extensions work continues as well as Town DPW Projects.  These may require road closures or lane reductions.  Please find below the anticipated road closures and lane restrictions.

Autumn Acres will be reduced to One-Lane this week for PFOA Water Line Extension Work.    Men and equipment will be on the edge of the roadway.  Please use caution and expect delays.

Harwood Hill Road -between Orchard Rd and Rte 7 Connector will be reduced to One-Lane Traffic for the next several weeks for PFOA Water Line Extension Work.  Men and equipment will be on edges of the roadway.  Please use Caution and Expect Delays.

Houghton Lane will be reduced to One-Lane Traffic for the next several weeks for PFOA Water Line Extension Work.  Men and equipment will be on edges of the roadway.  Please use Caution and Expect Delays.

Silver Street (Tuesday) between Grandview St and Prospect St be CLOSED to through traffic from 7:00a.m – 3:30p.m while Water Dept installs a new valve. Men and equipment will be in the roadway.  Please find alternate route.

Willow Roadwill be CLOSED for the next several weeks to through traffic for PFOA Water Line Extension Work.  Local traffic ONLY will be allowed.  Men and equipment will be in the roadway.  Please find alternate route.

 

TOWNWIDE:

Highway Crews will be in various locations across town conducting and completing smaller tasks from the construction season, this includes Road Patching.  PLEASE USE CAUTION when approaching these areas men & equipment may be on the edge or in the roadway.  Delays may be possible.

All Work will be dependent on weather conditions.  Please use caution when entering a construction zone, men and equipment will be in the traveled portion of the road.

 

REMINDER – LEAF SEASON :

Please DO NOT rake or blow leaves into Town streets or Highways as this will clog storm drains and create both flooding and driving hazards for the entire community.

Residents and Contractors – Please make sure ALL LOADS ARE COVERED when taking leaves and or brush to the Transfer Station. When disposing of leaf bags, you MUST empty the bags into the pile.

Remember: Parking Ban begins November 15th