DPW Roadwork Nov 02-06, 2020

Town of Bennington Project List

Week of November 02 – 06, 2020

 

Chapel Rd (Upper & Lower): will be reduced to One-Lane Traffic in various locations as the PFOA Contractor crew finishes edging roadwork from new paving recently installed.  Men and equipment will be on the edges of the roadway.  Please use Caution when approaching these areas and Expect Minor Delays.

 

TOWNWIDE:

A Water Crew will be conducting follow-up repairs to hydrants found in need during the recent semi-annual hydrant flushing.  Men and equipment will be in or on edge of the roadway.  Please use Caution and expect minor delays.

A Sewer Crew will be rebuilding manholes in various locations.  Men and equipment will be in or on edge of the roadway.  Please use Caution and expect minor delays.

Highway crews will be patching digs and potholes in various areas of town. Men and equipment will be in or on edge of the roadway.  Please use Caution and expect minor delays.

NORTH BENNINGTON:

The Highway Crew will be shutting down and winterizing the fountain as well as conducting park clean-ups.  Please use caution when approaching these areas and expect minor delays

 

All Work will be dependent on weather conditions.  Please use caution when entering a construction zone, men and equipment will be in the traveled portion of the road.

 

REMINDER – FALL :

Please DO NOT rake or blow leaves into Town streets or Highways as these clog storm drains and create flooding and driving hazards for the entire community.

Residents and Contractors – Please make sure ALL LOADS ARE COVERED when taking leaves and or brush to the Transfer Station.